× Popup Image

Extra development for McAleer & Rushe

Construction Professionals


McAleer & Rushe Contracts UK Ltd turned over ยฃ491.5m within the 12 months to thirty first December 2024, which was 13% larger than 2023’sย ยฃ436.4m, and consistent with administratorsโ€™ expectations.

Working revenue elevated by 52% to achieve ยฃ13.2m (2023: ยฃ8.7m) whereas pre-tax revenue was up 45% at ยฃ16.0m (2023: ยฃ11.0m).

Money at financial institution and in hand grew from ยฃ53m to ยฃ71m over the course of the 12 months.

Contracts accomplished by McAleer & Rushe within the 12 months included the 36-storey Trade Sq. house block in Birmingham, Metropolis Sq. Home workplace constructing in Leeds, Maldron motels in Liverpool and Manchester, pupil lodging developments in Leeds and Nottingham and the 13-block New Acres residential scheme for Authorized & Basic in Wandsworth, London.

A 12 months in the past, within the 2023 annual report, finance director Eamon Higgins wrote that 2025 turnover was anticipated to interrupt the ยฃ500m mark. Within the 2024 report he now says that turnover for 2025 is predicted to achieve ยฃ550m.

Obtained a narrative? E mail information@theconstructionindex.co.uk



Supply hyperlink

Leave a Comment